Skip to content

Adds documentation for CSR supporting all issuers, and the CTL command#615

Merged
jetstack-bot merged 6 commits intocert-manager:release-nextfrom
JoshVanL:csr-all-issuers
Jul 27, 2021
Merged

Adds documentation for CSR supporting all issuers, and the CTL command#615
jetstack-bot merged 6 commits intocert-manager:release-nextfrom
JoshVanL:csr-all-issuers

Conversation

@JoshVanL
Copy link
Contributor

@JoshVanL JoshVanL commented Jun 18, 2021

Signed-off-by: joshvanl vleeuwenjoshua@gmail.com

This PR documents the support for all CSR signer types, including their used annotations.

Also documents the cert-manager x create csr command.


This PR has been updated to remove the experimental.cert-manager.io/ca annotation, which has been removed from cert-manager.

NONE

@jetstack-bot jetstack-bot added do-not-merge/cherry-pick-not-approved Indicates that a PR is not yet approved to merge into a release branch. dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. approved Indicates a PR has been approved by an approver from all required OWNERS files. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. labels Jun 18, 2021
@jetstack-bot jetstack-bot added dco-signoff: no Indicates that at least one commit in this pull request is missing the DCO sign-off message. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. and removed dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. labels Jun 25, 2021
JoshVanL added 3 commits June 25, 2021 16:30
Signed-off-by: joshvanl <vleeuwenjoshua@gmail.com>
Signed-off-by: joshvanl <vleeuwenjoshua@gmail.com>
Signed-off-by: joshvanl <vleeuwenjoshua@gmail.com>
@jetstack-bot jetstack-bot added dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. and removed dco-signoff: no Indicates that at least one commit in this pull request is missing the DCO sign-off message. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. labels Jun 25, 2021
@netlify
Copy link

netlify bot commented Jul 19, 2021

✔️ Deploy Preview for cert-manager-website ready!

🔨 Explore the source changes: 42b5064

🔍 Inspect the deploy log: https://app.netlify.com/sites/cert-manager-website/deploys/60ffcfbedf4a610008601cd4

😎 Browse the preview: https://deploy-preview-615--cert-manager-website.netlify.app

Signed-off-by: joshvanl <vleeuwenjoshua@gmail.com>
@JoshVanL
Copy link
Contributor Author

/retest

Signed-off-by: joshvanl <vleeuwenjoshua@gmail.com>
Copy link
Contributor

@irbekrm irbekrm left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Looks good and clear to me.

Adding an lgtm with a hold if you want to address the two optional nits I added

/lgtm
/hold

@jetstack-bot jetstack-bot added the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Jul 26, 2021
@jetstack-bot jetstack-bot added the lgtm Indicates that a PR is ready to be merged. label Jul 26, 2021
@jetstack-bot
Copy link
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: irbekrm, JoshVanL

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@irbekrm
Copy link
Contributor

irbekrm commented Jul 26, 2021

/cherry-pick-approve

@irbekrm irbekrm added the cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager label Jul 26, 2021
@jetstack-bot jetstack-bot removed do-not-merge/cherry-pick-not-approved Indicates that a PR is not yet approved to merge into a release branch. lgtm Indicates that a PR is ready to be merged. labels Jul 26, 2021
@JoshVanL
Copy link
Contributor Author

Thanks @irbekrm, can you take another look?

`kubectl cert-manager x` description

Signed-off-by: joshvanl <vleeuwenjoshua@gmail.com>
@irbekrm
Copy link
Contributor

irbekrm commented Jul 27, 2021

Thanks for adding the changes, I've read through the doc again and it looks good

/lgtm

@jetstack-bot jetstack-bot added the lgtm Indicates that a PR is ready to be merged. label Jul 27, 2021
@irbekrm
Copy link
Contributor

irbekrm commented Jul 27, 2021

/hold cancel

@jetstack-bot jetstack-bot removed the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Jul 27, 2021
@jetstack-bot jetstack-bot merged commit 13f2b25 into cert-manager:release-next Jul 27, 2021
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. lgtm Indicates that a PR is ready to be merged. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants