Feat: Fixed db migration issues from v3.2.0 to 3.3.0 #1152
Triggered via pull request
September 24, 2024 12:08
Status
Failure
Total duration
6h 31m 15s
Artifacts
3
integration_test.yaml
on: pull_request
integration-tests
/
Plan
7s
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
integration-tests
/
Required Integration Test Status Checks
0s
Matrix: integration-tests / scan
Annotations
3 errors
integration-tests / Integration tests / Integration tests (test_charm)
The job running on runner openstack-amd64-edge-ps6-0-dc497d5f372dff0c64bc08ce has exceeded the maximum execution time of 360 minutes.
|
integration-tests / Integration tests / Integration tests (test_charm)
The operation was canceled.
|
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2024-09-24T12-08-42-8f9d__build__output__charm__discourse-k8s
|
11.1 MB |
|
2024-09-24T12-08-42-8f9d__build__output__rock__discourse
|
253 Bytes |
|
2024-09-24T12-08-42-8f9d__plan
|
342 Bytes |
|