Skip to content

Move iterator implementations to utils pkg #7551

Move iterator implementations to utils pkg

Move iterator implementations to utils pkg #7551

Triggered via pull request August 21, 2024 21:47
Status Cancelled
Total duration 1m 50s
Billable time 4m
Artifacts

ci.yml

on: pull_request
Fuzz
1m 11s
Fuzz
e2e_pre_etna
1m 14s
e2e_pre_etna
e2e_post_etna
1m 14s
e2e_post_etna
e2e_existing_network
1m 8s
e2e_existing_network
Upgrade
1m 10s
Upgrade
Lint
1m 10s
Lint
Protobuf Lint
6s
Protobuf Lint
Up-to-date protobuf
28s
Up-to-date protobuf
Up-to-date mocks
1m 7s
Up-to-date mocks
Up-to-date go.mod and go.sum
17s
Up-to-date go.mod and go.sum
Image build
1m 8s
Image build
Build Antithesis avalanchego images
1m 8s
Build Antithesis avalanchego images
Build Antithesis xsvm images
1m 9s
Build Antithesis xsvm images
Matrix: Unit
Fit to window
Zoom out
Zoom in

Annotations

32 errors and 2 warnings
Unit (windows-2022)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (windows-2022)
The operation was canceled.
Up-to-date mocks
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Up-to-date mocks
The operation was canceled.
Unit (ubuntu-20.04)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (ubuntu-20.04)
The operation was canceled.
Unit (ubuntu-22.04)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (ubuntu-22.04)
The operation was canceled.
Build Antithesis xsvm images
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Build Antithesis xsvm images
The operation was canceled.
e2e_existing_network
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
e2e_existing_network
The operation was canceled.
Fuzz
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Fuzz
The operation was canceled.
Build Antithesis avalanchego images
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Build Antithesis avalanchego images
The operation was canceled.
Upgrade
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Upgrade
The operation was canceled.
Unit (custom-arm64-focal)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (custom-arm64-focal)
The operation was canceled.
e2e_post_etna
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
e2e_post_etna
The operation was canceled.
Image build
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (custom-arm64-jammy)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Image build
The operation was canceled.
Unit (custom-arm64-jammy)
The operation was canceled.
Lint
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Lint
The operation was canceled.
e2e_pre_etna
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
e2e_pre_etna
The operation was canceled.
Unit (macos-12)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (macos-12)
The operation was canceled.
Up-to-date protobuf
No github_token supplied, API requests will be subject to stricter rate limiting
Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 20.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, head to https://github.com/actions/partner-runner-images repository.