Skip to content

Move iterator implementations to utils pkg #7550

Move iterator implementations to utils pkg

Move iterator implementations to utils pkg #7550

Triggered via pull request August 21, 2024 21:47
Status Cancelled
Total duration 56s
Billable time 2m
Artifacts

ci.yml

on: pull_request
Fuzz
44s
Fuzz
e2e_pre_etna
44s
e2e_pre_etna
e2e_post_etna
45s
e2e_post_etna
e2e_existing_network
46s
e2e_existing_network
Upgrade
45s
Upgrade
Lint
43s
Lint
Protobuf Lint
5s
Protobuf Lint
Up-to-date protobuf
23s
Up-to-date protobuf
Up-to-date mocks
43s
Up-to-date mocks
Up-to-date go.mod and go.sum
11s
Up-to-date go.mod and go.sum
Image build
43s
Image build
Build Antithesis avalanchego images
43s
Build Antithesis avalanchego images
Build Antithesis xsvm images
42s
Build Antithesis xsvm images
Matrix: Unit
Fit to window
Zoom out
Zoom in

Annotations

31 errors and 2 warnings
Unit (custom-arm64-focal)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (windows-2022)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (windows-2022)
The operation was canceled.
Unit (ubuntu-22.04)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (ubuntu-22.04)
The operation was canceled.
Build Antithesis xsvm images
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Build Antithesis xsvm images
The operation was canceled.
Lint
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Lint
The operation was canceled.
Up-to-date mocks
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Up-to-date mocks
The operation was canceled.
Unit (custom-arm64-jammy)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (custom-arm64-jammy)
The operation was canceled.
Unit (ubuntu-20.04)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Image build
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (ubuntu-20.04)
The operation was canceled.
Image build
The operation was canceled.
Build Antithesis avalanchego images
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Build Antithesis avalanchego images
The operation was canceled.
e2e_post_etna
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
e2e_post_etna
The operation was canceled.
e2e_pre_etna
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
e2e_pre_etna
The operation was canceled.
Fuzz
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Fuzz
The operation was canceled.
e2e_existing_network
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
e2e_existing_network
The operation was canceled.
Unit (macos-12)
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Unit (macos-12)
The operation was canceled.
Upgrade
Canceling since a higher priority waiting request for 'Tests-refs/pull/3320/merge' exists
Upgrade
The operation was canceled.
Up-to-date protobuf
No github_token supplied, API requests will be subject to stricter rate limiting
Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 20.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, head to https://github.com/actions/partner-runner-images repository.