Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
5 changes: 5 additions & 0 deletions README.md
Original file line number Diff line number Diff line change
Expand Up @@ -25,6 +25,11 @@ In general, these are the guidelines we consider when deciding what to pre-insta
- Tools and versions will typically be removed 6 months after they are deprecated or have reached end-of-life.
- If a tool can be installed during the build, we will evaluate how much time is saved
and how much space is used by having the tool pre-installed.
- MIT, Apache, and GNU licenses are ok, anything else we'll have to check with lawyers.
- If a tool takes much space we will evaluate space usage and provide a decision if this tool can be pre-installed.
- If a tool requires the support of more than one version, we will consider the cost of this maintenance, how often new versions bring dangerous updates.

**Note:** For new tools, please, create an issue and get an approval from us to add this tool to the image before creating the pull request.

## Updates to virtual environments
*Cadence*
Expand Down