Skip to content

eth/fetcher, trie: unit test reliability fixes #23020 #23415#1070

Merged
gzliudan merged 1 commit intoXinFinOrg:dev-upgradefrom
gzliudan:faster-shutdown
Jun 17, 2025
Merged

eth/fetcher, trie: unit test reliability fixes #23020 #23415#1070
gzliudan merged 1 commit intoXinFinOrg:dev-upgradefrom
gzliudan:faster-shutdown

Conversation

@gzliudan
Copy link
Copy Markdown
Collaborator

@gzliudan gzliudan commented Jun 3, 2025

Proposed changes

Ref:

Types of changes

What types of changes does your code introduce to XDC network?
Put an in the boxes that apply

  • Bugfix (non-breaking change which fixes an issue)
  • New feature (non-breaking change which adds functionality)
  • Breaking change (fix or feature that would cause existing functionality to not work as expected)
  • Documentation Update (if none of the other choices apply)
  • Regular KTLO or any of the maintaince work. e.g code style
  • CICD Improvement

Impacted Components

Which part of the codebase this PR will touch base on,

Put an in the boxes that apply

  • Consensus
  • Account
  • Network
  • Geth
  • Smart Contract
  • External components
  • Not sure (Please specify below)

Checklist

Put an in the boxes once you have confirmed below actions (or provide reasons on not doing so) that

  • This PR has sufficient test coverage (unit/integration test) OR I have provided reason in the PR description for not having test coverage
  • Provide an end-to-end test plan in the PR description on how to manually test it on the devnet/testnet.
  • Tested the backwards compatibility.
  • Tested with XDC nodes running this version co-exist with those running the previous version.
  • Relevant documentation has been updated as part of this PR
  • N/A

@gzliudan gzliudan changed the title eth/fetcher, trie: unit test reliability fixes #23020 eth/fetcher, trie: unit test reliability fixes #23020 #23415 Jun 3, 2025
…m#23415

Some tests take quite some time during exit, which I think causes
some appveyor fails like this:

    https://ci.appveyor.com/project/ethereum/go-ethereum/builds/39511210/job/xhom84eg2e4uulq3

One of the things that seem to take time during exit is waiting
(up to 100ms) for the syncbloom to close. This PR changes it to use
a channel, instead of looping with a 100ms wait.

This also includes some unrelated changes improving the reliability of
eth/fetcher tests, which fail a lot because they are time-dependent.
@gzliudan gzliudan merged commit 5e8a096 into XinFinOrg:dev-upgrade Jun 17, 2025
13 checks passed
@gzliudan gzliudan deleted the faster-shutdown branch June 17, 2025 05:21
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants