Skip to content

evidence(OMN-12526): bind dead EnvelopeRouter scaffold deletion - #1969

Merged
jonahgabriel merged 2 commits into
devfrom
jonahgabriel/omn-12526-evidence
May 31, 2026
Merged

jonahgabriel merged 2 commits into
devfrom
jonahgabriel/omn-12526-evidence

Conversation

@jonahgabriel

Copy link
Copy Markdown
Contributor

Binds central OCC evidence for omnibase_core PR #1186 (OMN-12526), which deletes the dead EnvelopeRouter dispatch scaffold and its exclusively-dead supporting cluster.

  • contracts/OMN-12526.yaml — contract with dod-core-pr-1186, dod-deploy-assessment, and dod-occ-pr evidence.
  • dod-deploy-assessment documents that this is a pure dead-code deletion touching runtime paths; no live deploy / runtime restart / docker exec / rpk topic produce required before merge (the deleted code never executed in production, per the Phase 1 dispatch parity proof).

Ticket: OMN-12526 (child of OMN-12525).

@coderabbitai

coderabbitai Bot commented May 31, 2026 •

Copy link
Copy Markdown

Warning

Review limit reached

@jonahgabriel, we couldn't start this review because you've reached your PR review rate limit.

More reviews will be available in 5 minutes and 30 seconds. Learn how PR review limits work.

Your organization has run out of usage credits. Purchase more in the billing tab.

⌛ How to resolve this issue?

After more reviews become available, a review can be triggered using the @coderabbitai review command as a PR comment. Alternatively, push new commits to this PR.

We recommend that you space out your commits to avoid hitting the rate limit.

🚦 How do rate limits work?

CodeRabbit enforces hourly rate limits for each developer per organization.

Our paid plans include higher PR review limits than trial, open-source, and free plans. In all cases, reviews become available again over time. During sustained high-volume PR review activity, CodeRabbit may temporarily slow when the next review becomes available.

Please see our Fair Usage Limits Policy for further information.

ℹ️ Review info
⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Pro

Run ID: 9ed9206b-6e68-42cd-af46-028aa0b6d4fc

📥 Commits

Reviewing files that changed from the base of the PR and between ff4b60f and ff145d4.

📒 Files selected for processing (4)
  • contracts/OMN-12526.yaml
  • drift/dod_receipts/OMN-12526/dod-core-pr-1186/command.yaml
  • drift/dod_receipts/OMN-12526/dod-deploy-assessment/command.yaml
  • drift/dod_receipts/OMN-12526/dod-occ-pr/command.yaml
✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch jonahgabriel/omn-12526-evidence

Comment @coderabbitai help to get the list of available commands and usage tips.

@jonahgabriel
jonahgabriel added this pull request to the merge queue May 31, 2026
Merged via the queue into dev with commit 2c87865 May 31, 2026
26 of 27 checks passed
@jonahgabriel
jonahgabriel deleted the jonahgabriel/omn-12526-evidence branch May 31, 2026 02:15
jonahgabriel added a commit that referenced this pull request Jun 13, 2026


Separate the bindings: dod-infra-consume-leg-refresh binds to the infra code PR #1969
(for infra occ-merge-eligibility); dod-occ-pr binds to THIS OCC PR #2596 (for this PR's
own occ-preflight eligibility). One receipt cannot satisfy both gates.
jonahgabriel added a commit that referenced this pull request Jun 13, 2026
…base_infra #1972)

Adds two dod_evidence items to the OMN-13118 contract for the strike-5
follow-up fix (#1972): independent AIOKafkaConsumer per terminal topic in
RuntimePatternBBroker._dispatch_and_wait_with_direct_kafka_consumer, raced via
asyncio.wait FIRST_COMPLETED — closing the subscription-flip that survived
#1969/#1970/#1971.

- dod-subscription-flip-repro: real-dispatch-path K>=10 x 2-cell x 2-arm repro;
  fake models TWO independent consumers honestly. RED (single-consumer revert
  hangs past timeout) / GREEN (independent consumers, 2.3s). Bound to #1972
  commit 5ce878788.
- dod-runtime-deploy-strike5: pre-deploy proof gate (repro RED->GREEN + local
  verify). The LIVE K>=10 multi-cell stability-lane reprobe is the deferred,
  operator-gated acceptance — explicitly NOT claimed here.

All six OMN-13118 receipts re-pinned to the updated contract hash.

Refs OMN-13118.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant