Skip to content

[Backport staging-25.11] elfutils: patch for run-sysroot test#468712

Merged
raboof merged 1 commit intostaging-25.11from
backport-468139-to-staging-25.11
Dec 7, 2025
Merged

[Backport staging-25.11] elfutils: patch for run-sysroot test#468712
raboof merged 1 commit intostaging-25.11from
backport-468139-to-staging-25.11

Conversation

@nixpkgs-ci
Copy link
Contributor

@nixpkgs-ci nixpkgs-ci bot commented Dec 7, 2025

Bot-based backport to staging-25.11, triggered by a label in #468139.

Before merging, ensure that this backport is acceptable for the release.

Even as a non-committer, if you find that it is not acceptable, leave a comment.

@nixpkgs-ci nixpkgs-ci bot mentioned this pull request Dec 7, 2025
13 tasks
@nixpkgs-ci nixpkgs-ci bot requested a review from r-burns December 7, 2025 16:05
@nixpkgs-ci nixpkgs-ci bot added 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-darwin: 1-10 This PR causes between 1 and 10 packages to rebuild on Darwin. 10.rebuild-linux: 5001+ This PR causes many rebuilds on Linux and must target the staging branches. 2.status: merge-bot eligible This PR can be merged by commenting "@NixOS/nixpkgs-merge-bot merge". 4.workflow: backport This targets a stable branch labels Dec 7, 2025
@raboof raboof added this pull request to the merge queue Dec 7, 2025
Merged via the queue into staging-25.11 with commit e897cd1 Dec 7, 2025
31 of 34 checks passed
@raboof raboof deleted the backport-468139-to-staging-25.11 branch December 7, 2025 20:43
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

2.status: merge-bot eligible This PR can be merged by commenting "@NixOS/nixpkgs-merge-bot merge". 4.workflow: backport This targets a stable branch 10.rebuild-darwin: 1-10 This PR causes between 1 and 10 packages to rebuild on Darwin. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 5001+ This PR causes many rebuilds on Linux and must target the staging branches.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant