Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
1 change: 1 addition & 0 deletions docs/hygiene-history/ticks/2026/04/29/0656Z.md
Original file line number Diff line number Diff line change
@@ -0,0 +1 @@
| 2026-04-29T06:56:09Z | claude-opus-4-7 | 26f978a2 | drain-cascade + #819-thread-triage tick. (1) PR #820 (tick 0649Z shard, no deps) and PR #811 (multi-AI absorb bundle round-1, foundation for the chain) both merged onto main. PR #811 auto-merged via the previously-armed queue. (2) PR #815 + PR #818 auto-merge armed (Depends-On dependency chain: #815 needs #811 ✓; #818 references #815). Will merge in order. (3) **PR #819 thread triage**: 4 unresolved threads — 1 markdown italic-span fix (REAL_DEFECT, applied in commit cc3da67) + 3 FORWARD_CROSS_PR_REFERENCE for B-0098..B-0104 references. Depends-On: #811, #815 added to #819 body. Triage comment posted, all 4 resolved. | [#820 merged](https://github.com/Lucent-Financial-Group/Zeta/pull/820), [#811 merged](https://github.com/Lucent-Financial-Group/Zeta/pull/811), [#815 + #818 auto-merge armed](https://github.com/Lucent-Financial-Group/Zeta/pull/815), [#819 4 threads resolved](https://github.com/Lucent-Financial-Group/Zeta/pull/819) | FORWARD_CROSS_PR_REFERENCE applied to a 3-deep downstream PR (#819) — the dependency chain (#811 → #815 → #819) is now fully encoded via Depends-On + auto-merge ordering. (The class itself was already used on the upstream pair via PR #815 + #818 in tick 0649Z; this is the deeper-chain instance, not the first use of the class.) Pattern observation: the Depends-On annotation became more useful than expected — Copilot was flagging real cross-PR-reference issues that the encoded dependency makes safely deferrable. The merge order matters because each PR cites substrate from the prior. Without the dependency chain, downstream PRs would either fail merge OR succeed-but-leave-broken-references. The factory's discipline is now mature enough to chain ordered dependencies across multiple absorb rounds. |
Loading