Skip to content

tick-history: 2026-04-29T05:50Z — drain + Aaron mid-tick durable-retry correction (#804)#805

Merged
AceHack merged 2 commits intomainfrom
tick-history/2026-04-29-tick-0550Z-shard
Apr 29, 2026
Merged

tick-history: 2026-04-29T05:50Z — drain + Aaron mid-tick durable-retry correction (#804)#805
AceHack merged 2 commits intomainfrom
tick-history/2026-04-29-tick-0550Z-shard

Conversation

@AceHack
Copy link
Copy Markdown
Member

@AceHack AceHack commented Apr 29, 2026

Summary

Tick 05:50Z shard:

Test plan

  • Schema correct (single row, 6 pipe-separated columns)
  • PR refs render
  • Aaron's verbatim quote preserved in the body cell

🤖 Generated with Claude Code

…k durable-retry correction (#804)

3 CLEAN PRs squash-merged (#801/#802/#803). Aaron's /btw aside
answered (EAT document location). Mid-tick correction caught the
elan-toolchain-502 rerun anti-pattern from earlier this session;
durable fix landed in PR #804 (memory file + linux.sh + elan.sh
migrated to curl_fetch). First non-tick-history substrate this
session.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
Copilot AI review requested due to automatic review settings April 29, 2026 05:57
Copy link
Copy Markdown

Copilot AI left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Pull request overview

Adds the 2026-04-29T05:50Z tick-history shard entry documenting the session drain (PRs #801#803) plus a mid-tick correction and the follow-on durable-retry fix work tracked in PR #804.

Changes:

  • Adds a new tick-history shard file for 05:50Z with a single-row, 6-column entry.
  • Records drain status and cross-references related PRs and documents.

Comment thread docs/hygiene-history/ticks/2026/04/29/0550Z.md Outdated
…ix + explicit backlog paths)

PR #805 review thread from copilot-pull-request-reviewer:
1. Cross-reference style: memory file path needs `memory/`
   prefix (consistent with other shards).
2. "pending task #307" reads ambiguously (looks like a GH PR
   number). Replace with explicit backlog row paths
   (B-0062 + B-0074 full paths).

Both fixes applied; row content unchanged.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
@AceHack AceHack merged commit 372f189 into main Apr 29, 2026
20 checks passed
@AceHack AceHack deleted the tick-history/2026-04-29-tick-0550Z-shard branch April 29, 2026 06:10
AceHack added a commit that referenced this pull request Apr 29, 2026
 pending CI (#807)

Two CLEAN PRs merged. PR #804 (durable-retry fix) is now on main —
future external-dep download flakes absorbed via curl_fetch retry.
PR #806 (multi-AI feedback absorb bundle) waiting on CI — real-
dependency wait, not manufactured patience.

Co-authored-by: Claude Opus 4.7 <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants