Skip to content

drain(#226 follow-up 2): CC log schema + populated-state alignment - #434

Merged
AceHack merged 2 commits into
mainfrom
drain/226-followup-2-cc-schema-alignment
Apr 25, 2026
Merged

drain(#226 follow-up 2): CC log schema + populated-state alignment#434
AceHack merged 2 commits into
mainfrom
drain/226-followup-2-cc-schema-alignment

drain(#226 follow-up 2): fix Copilot P1/P2 — schema + idempotency

acac9d4
Select commit
Loading
Failed to load commit list.
GitHub Advanced Security / CodeQL completed Apr 25, 2026 in 2s

1 configuration not found

Warning: Code scanning cannot determine the alerts introduced by this pull request, because 1 configuration present on refs/heads/main was not found:

Actions workflow (codeql.yml)

  • ❓  /language:java-kotlin

View all branch alerts.