Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
83 changes: 83 additions & 0 deletions docs/hygiene-history/ticks/2026/05/16/0328Z.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,83 @@
# Tick 2026-05-16T03:28Z — Otto-CLI

**Surface**: Otto-CLI (Claude Code, Opus 4.7 1M context, autonomous-loop tick)
**Parent tick**: [2026-05-16T03:22Z](0322Z.md) — PR #3690 markdownlint MD038 unblock
Comment thread
AceHack marked this conversation as resolved.
Comment thread
AceHack marked this conversation as resolved.

## What landed this tick

**Audit-script lifecycle closure**: 3 PRs from the prior ticks merged in rapid succession (#3699 baseline mechanism, #3703 tick-12 shard, #3690 markdownlint-unblocked-after-70-min), and the CI enforce gate opened (armed for auto-merge) as the final step.

[PR #3708](https://github.com/Lucent-Financial-Group/Zeta/pull/3708) — `feat(ci): wire lint (tick-shard relative-paths) gate — --enforce --baseline`

## State at tick start

| PR | Action |
|----|--------|
| ~~#3699~~ (baseline mechanism) | MERGED 03:20:19Z |
| ~~#3703~~ (0316Z shard) | MERGED 03:21:32Z |
| ~~#3690~~ (0240Z + MD038 fix) | MERGED 03:23:06Z (after 70+ min of being blocked) |
Comment thread
AceHack marked this conversation as resolved.
| #3707 (0322Z shard + self-bite fix) | still OPEN, armed |

## The CI gate wire

Added `lint-tick-shard-relative-paths` job to `.github/workflows/gate.yml`, modeled on the `lint-section-33-migration-xrefs` sibling:

```yaml
- name: Run audit-tick-shard-relative-paths (--enforce --baseline)
run: |
bun tools/hygiene/audit-tick-shard-relative-paths.ts \
--enforce \
--baseline tools/hygiene/audit-tick-shard-relative-paths.baseline.json
```

Non-required by default (per gate.yml convention). Surfaces as a status check on every PR. New tick-shard violations fail the check; the 10 grandfathered findings in the baseline file stay invisible to the gate.

## Audit-script lifecycle: COMPLETE

| Step | PR | Status | Tick |
|------|-----|--------|------|
| 1. Discovery (bug class shipped) | #3676 / #3679 | merged | 3 |
| 2. Narrow fix per-shard | #3676 fixup, #3680 | merged | 3 |
| 3. Scanner authored | #3692 | merged | 7 |
| 4. Filter improvement (17 → 10) | #3692 fixup | merged | 8 |
| 5. Quality round 1 (4 fixes) | #3692 fixup | merged | 9 |
| 6. Quality round 2 (2 cross-platform) | #3692 fixup | merged | 10 |
| 7. Baseline mechanism | #3699 | merged | 11 |
| 8. Quality round 3 (schema + API) | #3699 fixup | merged | 12 |
| 9. **CI enforce gate** | **#3708** | **armed** | **14 (this)** |

Same lifecycle as §33 migration-xref audit (PR #3513 → #3552 → enforce), compressed across 14 ticks of one session instead of 4 weeks.

## Local verify on this PR's branch

```text
scanned 842 tick shards; 10 broken relative-path links (10 grandfathered by baseline, 0 new):
exit: 0
```

Shard count grew from 833 (tick 7 baseline) to 842 (+9 from this session's merged PRs).

The earlier transient `0249Z.md:4 → 0240Z.md` "new" finding is no longer surfacing because PR #3690 merged the 0240Z file to main — the cross-reference now resolves.

## Operational notes

### The §33 audit lifecycle is a portable pattern

Both audits followed: **discovery → narrow-fix → scanner → quality iterations → baseline → enforce gate**. The iteration count (quality rounds) varies with finding density and reviewer pass count. For this audit: 3 quality rounds catching 9 real findings total — convergence at 3rd round (zero new findings since).

The pattern is reusable for any future repo-hygiene audit. Worth promoting to a docs surface (per the "Lifecycle: ..." comment block in `gate.yml` for both jobs).

### Holding-discipline state

CI gate landed this tick — concrete substrate that mechanizes the bug class for all future tick shards. Counter resets.

### Todo tracking adopted

This tick used `TodoWrite` for the 4-step gate-wire process (wire → verify → PR → shard). The structure aligned naturally with the per-tick discipline and made the "in_progress" boundary visible. Worth carrying forward for substantive multi-step ticks.

## Next-tick candidates

1. **Monitor PR #3707 + #3708 to merge**
2. **B-0545 renumber-sweep** (claim still active until 2026-05-17T01:44Z)
3. **MD038 + MD032 pre-commit discipline promotion** — add `bun x markdownlint-cli2` as a sibling self-check before shard pushes
4. **Promote the audit-lifecycle pattern** (discovery → narrow-fix → scanner → quality × N → baseline → enforce) to a docs surface — reusable template for future hygiene audits
Loading