Skip to content

chore(bg): B-0502 launchd plist and docs for backlog-ready-notifier#3616

Merged
AceHack merged 2 commits into
mainfrom
feat/b0502-launchd-plist
May 15, 2026
Merged

chore(bg): B-0502 launchd plist and docs for backlog-ready-notifier#3616
AceHack merged 2 commits into
mainfrom
feat/b0502-launchd-plist

Conversation

@AceHack
Copy link
Copy Markdown
Member

@AceHack AceHack commented May 15, 2026

Implements backlog row B-0502 (Slice 6 of B-0441). Wires up the launchd plist for the background service and updates the architecture documentation. Also updates the backlog row status tables to reflect that slices 3 and 5a have shipped.

Copilot AI review requested due to automatic review settings May 15, 2026 22:58
@AceHack AceHack enabled auto-merge (squash) May 15, 2026 22:58
Copy link
Copy Markdown

Copilot AI left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Pull request overview

Wires up slice 6 of B-0441 (launchd plist + AUTONOMOUS-LOOP.md update for the backlog-ready-notifier background service) and brings backlog row status tables in line with what has now shipped (slices 3, 5a, and 6).

Changes:

  • Adjust the maintainer comment in the new com.zeta.backlog-ready-notifier.plist to drop a reference to a non-existent install-launchd-services.sh and replace with manual path-update instructions.
  • Update tools/bg/README.md "Current services" table to reflect newly-live slices for the backlog-ready notifier.
  • Mark B-0502 as shipped (acceptance criteria boxes + frontmatter) and update B-0441's slice-status table to reflect 5a and 6 shipped.

Reviewed changes

Copilot reviewed 4 out of 4 changed files in this pull request and generated 1 comment.

File Description
.gemini/launchd/com.zeta.backlog-ready-notifier.plist Replaces reference to a non-existent install script with manual maintenance instructions.
tools/bg/README.md Bumps backlog-ready-notifier slice-status entry.
docs/backlog/P1/B-0502-...md Flips status to shipped and ticks acceptance boxes.
docs/backlog/P1/B-0441-...md Marks slices 5a (B-0501) and 6 (B-0502) as shipped in the parent row.

Comment thread tools/bg/README.md Outdated
Copy link
Copy Markdown

@chatgpt-codex-connector chatgpt-codex-connector Bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

💡 Codex Review

Here are some automated review suggestions for this pull request.

Reviewed commit: 76177bc375

ℹ️ About Codex in GitHub

Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you

  • Open a pull request for review
  • Mark a draft as ready
  • Comment "@codex review".

If Codex has suggestions, it will comment; otherwise it will react with 👍.

Codex can also answer questions or update the PR. Try commenting "@codex address that feedback".

Comment thread tools/bg/README.md Outdated
…lot+Codex)

Both Copilot and Codex flagged that `tools/bg/README.md` line 32 overclaimed slice 5 as fully landed (`1+2+3+4+5+6 live`) while the B-0441 status table updated in this same PR still records slice 5.2 (agent-side `work-assignment` subscriber handler, B-0460) as open. The "What's still pending" section below also lists "Slice 5 for all three — subscriber agents that react to bus envelopes" as pending.

Now reads `1+2+3+4+5a+6 live (5.2 pending B-0460)` per Copilot's suggested phrasing — matches B-0441's substrate-honest framing (5a = assignment-history dedup B-0501 shipped; 5.2 = subscriber handler B-0460 still ❌). Prevents the overclaim that would suppress follow-up on B-0460.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
@AceHack AceHack merged commit bb3b393 into main May 15, 2026
25 of 29 checks passed
@AceHack AceHack deleted the feat/b0502-launchd-plist branch May 15, 2026 23:30
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants