As a developer, I want to complete the preparatory steps prior to migrating TOSCA to use the IBEX instrument control system.
Note: TOSCA has a full programme of experiments from the start of Cycle 2018/03 (13th November 2018 onwards).
Acceptance Criteria
- Facilities IT have confirmed they will create a private network on TOSCA
- NDXTOSCA has sufficient free disk space to install IBEX
- IBEX has support for the devices used on TOSCA
- The version of the ICP program on TOSCA has been checked
- Configuration files matching the current SECI config files used on TOSCA are created
- TOSCA scripts are converted to genie_python
- TOSCA configuration files and genie_python scripts are tested on a test instance of IBEX
Notes
- The devices on TOSCA are listed on the TOSCA Instrument Details list
- Use the Migrate-an-Instrument-Control-PC page to guide you through the migration process. The following activities need to be completed as part of the migration process:
- Ask Facilities IT (Anthony Shuttle) to create a private network for TOSCA. This is required so that we can use TCP/IP to communicate with the Galils. Facilities IT will need notice of about 4-6 weeks.
- Check that NDXTOSCA has sufficient disk space to install IBEX
- TOSCA has 41.5-Gb of free space.
- Check whether TOSCA uses 5- or 8- digit run-numbers
- If it uses 5-digit run-numbers, plan to upgrade the ICP program (to permit 8-digit run-numbers)
- Create a virtual instrument for testing purposes
- Set up a test system, NDXTEST3.
- create IBEX configurations to correspond to their SECI equivalents
- create genie-python scripts to correspond to their Open-Genie equivalents
- consult with scientists as you do this (see the Migrate-an-Instrument-Control-PC page).
- test these configurations & scripts
- check that all the devices previously supported by SECI (on TOSCA) are supported by IBEX
- arrange one or more training sessions with the scientists to help them understand how to use IBEX
- Done! Training arranged for 1st November 2018.