Skip to content

chore: bump version to v0.65.0#1365

Merged
jansegre merged 1 commit intomasterfrom
chore/prepare-for-v0.65.0
Aug 20, 2025
Merged

chore: bump version to v0.65.0#1365
jansegre merged 1 commit intomasterfrom
chore/prepare-for-v0.65.0

Conversation

@jansegre
Copy link
Member

@jansegre jansegre commented Aug 18, 2025

Motivation

We caught an issue during v0.64.0 after the last release-candidate, so we will need another version bump.

Acceptance Criteria

  • Bump version to v0.65.0
  • Update BUILD_VERSION_REGEX to accept alpha and beta version-tags, in addition to rc (that was previously supported)

Checklist

  • If you are requesting a merge into master, confirm this code is production-ready and can be included in future releases as soon as it gets merged

@github-actions
Copy link

github-actions bot commented Aug 18, 2025

🐰 Bencher Report

Branchchore/prepare-for-v0.65.0
Testbedubuntu-22.04

🚨 1 Alert

BenchmarkMeasure
Units
ViewBenchmark Result
(Result Δ%)
Upper Boundary
(Limit %)
sync-v2 (up to 20000 blocks)Latency
minutes (m)
📈 plot
🚷 threshold
🚨 alert (🔔)
1.83 m
(+10.26%)Baseline: 1.66 m
1.82 m
(100.24%)

Click to view all benchmark results
BenchmarkLatencyBenchmark Result
minutes (m)
(Result Δ%)
Lower Boundary
minutes (m)
(Limit %)
Upper Boundary
minutes (m)
(Limit %)
sync-v2 (up to 20000 blocks)📈 view plot
🚷 view threshold
🚨 view alert (🔔)
1.83 m
(+10.26%)Baseline: 1.66 m
1.49 m
(81.63%)
1.82 m
(100.24%)

🐰 View full continuous benchmarking report in Bencher

@codecov
Copy link

codecov bot commented Aug 18, 2025

Codecov Report

✅ All modified and coverable lines are covered by tests.
✅ Project coverage is 85.63%. Comparing base (a7ca60b) to head (9588a18).
⚠️ Report is 2 commits behind head on master.

Additional details and impacted files
@@           Coverage Diff           @@
##           master    #1365   +/-   ##
=======================================
  Coverage   85.63%   85.63%           
=======================================
  Files         429      429           
  Lines       32440    32440           
  Branches     5069     5069           
=======================================
+ Hits        27780    27781    +1     
- Misses       3629     3631    +2     
+ Partials     1031     1028    -3     

☔ View full report in Codecov by Sentry.
📢 Have feedback on the report? Share it here.

🚀 New features to boost your workflow:
  • ❄️ Test Analytics: Detect flaky tests, report on failures, and find test suite problems.

@jansegre jansegre moved this from Todo to In Progress (WIP) in Hathor Network Aug 18, 2025
@jansegre jansegre moved this from In Progress (WIP) to In Progress (Done) in Hathor Network Aug 18, 2025
@jansegre jansegre force-pushed the chore/prepare-for-v0.65.0 branch from 597c8fc to 968752f Compare August 18, 2025 23:11
@jansegre jansegre requested a review from glevco August 19, 2025 19:56
msbrogli
msbrogli previously approved these changes Aug 19, 2025
glevco
glevco previously approved these changes Aug 19, 2025
@github-project-automation github-project-automation bot moved this from In Progress (Done) to In Review (WIP) in Hathor Network Aug 19, 2025
@jansegre jansegre moved this from In Review (WIP) to In Review (Done) in Hathor Network Aug 19, 2025
@jansegre jansegre dismissed stale reviews from glevco and msbrogli via 0f88d5e August 19, 2025 21:30
@jansegre jansegre force-pushed the chore/prepare-for-v0.65.0 branch from 968752f to 0f88d5e Compare August 19, 2025 21:30
@jansegre jansegre force-pushed the chore/prepare-for-v0.65.0 branch from 0f88d5e to 9588a18 Compare August 19, 2025 21:34
@github-project-automation github-project-automation bot moved this from In Review (Done) to In Review (WIP) in Hathor Network Aug 20, 2025
@glevco glevco moved this from In Review (WIP) to In Review (Done) in Hathor Network Aug 20, 2025
@jansegre jansegre merged commit e33ea53 into master Aug 20, 2025
12 of 14 checks passed
@jansegre jansegre deleted the chore/prepare-for-v0.65.0 branch August 20, 2025 14:01
@github-project-automation github-project-automation bot moved this from In Review (Done) to Waiting to be deployed in Hathor Network Aug 20, 2025
This was referenced Aug 20, 2025
@jansegre jansegre moved this from Waiting to be deployed to Done in Hathor Network Aug 21, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Archived in project

Development

Successfully merging this pull request may close these issues.

3 participants