Skip to content

ci: increase time limit for cartesian / dace tests on gh200

f650bc1
Select commit
Loading
Failed to load commit list.
Sign in for the full log view
Merged

ci[cartesian]: increase time limit for cartesian / dace tests on gh200 #2335

ci: increase time limit for cartesian / dace tests on gh200
f650bc1
Select commit
Loading
Failed to load commit list.

The logs for this run have expired and are no longer available.