Skip to content

docs: sync documentation with 2026-04-14 evening-tick merges (#63, #64, #65) - #67

Merged
HongmingWang-Rabbit merged 1 commit into
mainfrom
docs/sync-2026-04-14-tick-4
Apr 14, 2026
Merged

docs: sync documentation with 2026-04-14 evening-tick merges (#63, #64, #65)#67
HongmingWang-Rabbit merged 1 commit into
mainfrom
docs/sync-2026-04-14-tick-4

Conversation

@HongmingWang-Rabbit

Copy link
Copy Markdown
Contributor

Summary

Test plan

Docs-only PR. Do not merge on open; leave for reviewer.

Co-Authored-By: Claude Opus 4.6 (1M context) noreply@anthropic.com

#65)

- edit-history/2026-04-14.md: append tick-4 section covering the 12
  modular guardrail plugins (#63), global-secrets auto-restart fan-out
  (#64, fixes issue #15), and synthetic restart-context A2A message
  (#65, fixes issue #19 Layer 1; Layer 2 deferred to issue #66).
- CLAUDE.md: bump Go test count 699 -> 726 (measured); note global
  secrets auto-restart on SetGlobal/DeleteGlobal in the route table;
  add Workspace Lifecycle paragraph for the restart-context message
  and its system:restart-context caller prefix.
- PLAN.md: bump Go test count in the coverage table; record issues
  #15 and #19 Layer 1 as launched; add new Backlog entry for the
  Layer 2 follow-up (issue #66).

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
@HongmingWang-Rabbit

Copy link
Copy Markdown
Contributor Author

noteworthy: docs (CLAUDE.md + PLAN.md) — agent-facing source of truth. Code-review skill ran the 16-criteria rubric: 0 🔴 / 0 🟡 / 3 🔵 (cosmetic). All load-bearing claims verified — Go count 726 measured-correct, issues #15/#19 closed, #66 open, system:restart-context caller prefix matches restart_context.go on main.

@HongmingWang-Rabbit
HongmingWang-Rabbit merged commit b9b96c9 into main Apr 14, 2026
13 of 14 checks passed
@HongmingWang-Rabbit
HongmingWang-Rabbit deleted the docs/sync-2026-04-14-tick-4 branch April 14, 2026 20:03
HongmingWang-Rabbit pushed a commit that referenced this pull request Apr 14, 2026
Backlog items 11-14 used sequential enumeration (#64/#65/#66/#67) as
intra-doc bookkeeping. Those numbers now collide with actual merged
PRs and open issues with completely different scopes:
  - PR #64 = auto-refresh global_secrets (not "delegations list")
  - PR #65 = restart context Layer 1 (not "per-agent repo access")
  - Issue #66 = restart_prompt Layer 2 (not "SDK swallows stderr")
  - PR #67 = docs sync tick-4 (not "MCP localhost default")

Strip the misleading refs and add a footnote explaining the cleanup.
If/when any of these items get prioritized, file real GitHub issues.

Tracked in cron-learnings tick-3 entry.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
molecule-ai Bot pushed a commit that referenced this pull request Apr 21, 2026
docs: sync documentation with 2026-04-14 evening-tick merges (#63, #64, #65)
molecule-ai Bot pushed a commit that referenced this pull request Apr 21, 2026
Backlog items 11-14 used sequential enumeration (#64/#65/#66/#67) as
intra-doc bookkeeping. Those numbers now collide with actual merged
PRs and open issues with completely different scopes:
  - PR #64 = auto-refresh global_secrets (not "delegations list")
  - PR #65 = restart context Layer 1 (not "per-agent repo access")
  - Issue #66 = restart_prompt Layer 2 (not "SDK swallows stderr")
  - PR #67 = docs sync tick-4 (not "MCP localhost default")

Strip the misleading refs and add a footnote explaining the cleanup.
If/when any of these items get prioritized, file real GitHub issues.

Tracked in cron-learnings tick-3 entry.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant