Skip to content

Fix: Add blog as incident report#21356

Merged
Sameerlite merged 3 commits intomainfrom
litellm_incident_claude_code
Feb 17, 2026
Merged

Fix: Add blog as incident report#21356
Sameerlite merged 3 commits intomainfrom
litellm_incident_claude_code

Conversation

@Sameerlite
Copy link
Copy Markdown
Contributor

Relevant issues

Pre-Submission checklist

Please complete all items before asking a LiteLLM maintainer to review your PR

  • I have Added testing in the tests/litellm/ directory, Adding at least 1 test is a hard requirement - see details
  • My PR passes all unit tests on make test-unit
  • My PR's scope is as isolated as possible, it only solves 1 specific problem
  • I have requested a Greptile review by commenting @greptileai and received a Confidence Score of at least 4/5 before requesting a maintainer review

CI (LiteLLM team)

CI status guideline:

  • 50-55 passing tests: main is stable with minor issues.
  • 45-49 passing tests: acceptable but needs attention
  • <= 40 passing tests: unstable; be careful with your merges and assess the risk.
  • Branch creation CI run
    Link:

  • CI run for the last commit
    Link:

  • Merge / cherry-pick CI run
    Links:

Type

🆕 New Feature
🐛 Bug Fix
🧹 Refactoring
📖 Documentation
🚄 Infrastructure
✅ Test

Changes

@vercel
Copy link
Copy Markdown

vercel bot commented Feb 17, 2026

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
litellm Ready Ready Preview, Comment Feb 17, 2026 4:02am

Request Review

@greptile-apps
Copy link
Copy Markdown
Contributor

greptile-apps bot commented Feb 17, 2026

Greptile Summary

This PR rewrites the existing Claude Code beta headers blog post from a how-to/configuration guide into an incident report format. The content now documents an incident where Claude Code sent unsupported Anthropic beta headers to non-Anthropic providers (Bedrock, Azure AI, Vertex AI), causing invalid beta flag errors.

  • The blog post slug, title, description, and tags are updated to reflect the incident report format, consistent with the existing model_cost_map_incident blog post
  • Technical content is restructured into standard incident report sections: Summary, Background, Root Cause, Timeline, Remediation, and Resolution Steps
  • The embedded mermaid diagrams illustrating old vs. new behavior are preserved
  • Issue found: The incident date in the header ("February 13, 2026") conflicts with the timeline dates ("Feb 15-16, 2026")

Confidence Score: 4/5

  • This PR is safe to merge — it only modifies a documentation blog post with no code changes.
  • The PR only changes a single blog post markdown file, converting it from a guide to an incident report. There are no code changes, no risk to runtime behavior, and the structure follows the existing incident report convention. The one issue found is a date inconsistency that should be corrected for accuracy.
  • The date inconsistency in docs/my-website/blog/claude_code_beta_headers/index.md (line 22 vs lines 71-75) should be resolved before merge.

Important Files Changed

Filename Overview
docs/my-website/blog/claude_code_beta_headers/index.md Rewrites the blog post from a how-to guide into an incident report format. Contains a date inconsistency between the incident header (Feb 13) and the timeline (Feb 15-16).

Flowchart

flowchart TD
    A[Original Blog Post] -->|slug: claude_code_beta_headers| B[How-To Guide Format]
    B --> C[Step-by-step configuration instructions]
    B --> D[Code examples for adding headers]
    B --> E[Contributing guide]

    A -->|PR Changes| F[Incident Report Format]
    F -->|slug: claude-code-beta-headers-incident| G[Incident Summary & Timeline]
    F --> H[Root Cause Analysis]
    F --> I[Remediation Table]
    F --> J[Resolution Steps for Users]
Loading

Last reviewed commit: 53728b4

Copy link
Copy Markdown
Contributor

@greptile-apps greptile-apps bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

1 file reviewed, 1 comment

Edit Code Review Agent Settings | Greptile

curl -X POST "https://your-proxy-url/schedule/anthropic_beta_headers_reload?hours=24" \
-H "Authorization: Bearer YOUR_ADMIN_TOKEN"
```
**Date:** February 13, 2026
Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Inconsistent incident date

The incident date listed here is "February 13, 2026", but the timeline section (lines 71-75) places all events on February 15-16, 2026. These dates should be reconciled — either the header date should be updated to February 15, or the timeline dates need correcting.

@Sameerlite Sameerlite merged commit 4936aab into main Feb 17, 2026
13 of 47 checks passed
@ishaan-berri ishaan-berri deleted the litellm_incident_claude_code branch March 26, 2026 22:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant