Skip to content
This repository has been archived by the owner on Jan 18, 2023. It is now read-only.

Latest commit

 

History

History
28 lines (20 loc) · 841 Bytes

back-burner.md

File metadata and controls

28 lines (20 loc) · 841 Bytes

Back Burner Board

Supplies needed: Whiteboard, Markers

Estimated time: 30min for review

Best to use when

A lot of ideas will be generated throughout the week. Some of the ideas will be pertinent to the tasks at hand, but others, although interesting, won’t be. Capture these good but not immediately relevant back burner ideas on a sticky note board.

Instructions

  1. Have a dedicated space to collect back burner ideas on the whiteboard.
  • Throughout the sprint have everyone write down ideas that are not directly solving the job-to-be-done and put them up on the whiteboard.
  • As a team during the converge phase, review all the ideas that have been put up on the wall. Trash any that aren't relevant anymore.
  • Record all ideas in a separate document or Trello.

Example

Back Burner