From 3cfe21dfd732a5f7781cd6622a31e3dc99997fb6 Mon Sep 17 00:00:00 2001 From: Brian Searls Date: Mon, 11 May 2026 00:12:10 +0000 Subject: [PATCH 1/2] docs(audit): SG-0 trajectory snapshot 2026-05-11 (+4 vs prior EOD) MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit PM standing daily-cadence duty per docs/audit/r3-sg0-trajectory-tracker.md §5. Today (31acf4357): non_test=53 test=112 fragments=2 total=167. Delta vs 2026-05-10 EOD baseline (163): +4 test entries. The 4 new entries are gate-landing tests, identified via per-entry diff: - lens_behavioral_parity_demonstration_test.rs (gate #73, snappy-raven-508 PR #2525) - r3_gate_87_lens_cementing_regen_receipts_test.rs (gate #87 PR #2639) - r3_lens_producer_retirement_executable_witness_test.rs (PR #2595) - t_ci_workflow_as_data_demo_test.rs (T-Workflow-As-Data demo) Many gates landed during the 2026-05-10 → 2026-05-11 cycle (T-Tests-As-Data #84/#85/#86/#87; T-Bridge-Retirement #31; T-LensProducer #5+#6; T-V-L4 #11/#13; T-V-L7 #10/#15; #74 + #27 + #26 and many others). Cluster M Phase 3 bulk-port has NOT yet kicked in to shrink the census — calm-newt-602 (gate #84) + silent-swift-300 (cementing+behavioral-parity census slice) are active workers; their migration work is what flips trajectory from accumulating to shrinking. 11-day cumulative is +47 entries; per-day avg +4.3. Velocity tripwire status remains pending/uncomputed until Phase 3 migration begins producing dissolution events. Co-Authored-By: Claude Opus 4.7 (1M context) --- docs/audit/r3-sg0-trajectory-tracker.md | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-) diff --git a/docs/audit/r3-sg0-trajectory-tracker.md b/docs/audit/r3-sg0-trajectory-tracker.md index a8e72e48b31..9a5f9628901 100644 --- a/docs/audit/r3-sg0-trajectory-tracker.md +++ b/docs/audit/r3-sg0-trajectory-tracker.md @@ -52,10 +52,11 @@ echo "$(date -u +%Y-%m-%d) | $sha | non_test=$non_test test=$test fragments=$fra | **2026-05-09 EOD** | **eb2cc15cd** (last commit before 2026-05-10 UTC) | **53** | **107** | **2** | **162** | **+12 (retroactive correction; 9-day total: +42)** | 12 entries landed during 2026-05-09 evening: T-CostLens γ-ratification (#2283), R3 plan audit (#2501), 21-PR cycle (R3 P0 dissolutions + gate landings + audit + bridge retirements) | retroactive baseline correction; previous tracker row (150) was taken mid-day on 2026-05-09 before the evening cycle landed; honest EOD count is 162 | | **2026-05-10 (00:38Z)** | **f1588bcc8** | **53** | **107** | **1** | **161** | **−1 (vs 2026-05-09 EOD)** | (none) — 1 fragment removed (`parse_corpus_manifest.txt`-class transient) between eb2cc15cd and f1588bcc8 | Director-receipted intermediate reading at gunbc#828 c#4414054598 (committed on `session/gentle-newt-665` branch as 88e6fca99; never merged to main due to session archival). Director framing: "Trajectory NOT yet inflected toward shrink — bulk events queued (gate #6 wise-crane-831 ACTIVE, F2 PR #2473, T-Tier3 D2a PR #2285, carve-promotion #81/#82/#83/#95) but pre-land at snapshot. Alarm 1 + Alarm 2 tripped on extrapolation against the (then-stale) 150 baseline." Honest delta vs corrected EOD baseline (162) is **−1** (a marginal shrinkage), not +11 | | **2026-05-10 (later)** | **cea1fbe87** | **53** | **108** | **2** | **163** | **+2 (vs f1588bcc8 intermediate; +1 vs 2026-05-09 EOD)** | PR #2506 [codex] add anthropic wire demo (1 test entry + 1 fragment re-added: `anthropic_messages_wire_demo_test.rs` + manifest fragment) | **velocity is steady, not anomalous** (prior +13 framing was a baseline-comparison artifact; Director's +11 framing was the same artifact against the 150 baseline). True 1-day delta vs 2026-05-09 EOD is +1 entry net; cumulative 10-day total is +43 (+30 prior + +12 retroactive 2026-05-09 evening + +1 today). Velocity tripwire (≥3:1 introduction:dissolution, 7-day): **status pending/uncomputed** — 7-day cumulative ratio not yet computed in this snapshot; will be computed once Cluster M Phase 1 lands | +| **2026-05-11** | **31acf4357** | **53** | **112** | **2** | **167** | **+4 (vs 2026-05-10 cea1fbe87)** | 4 new test entries from gate-landings during 2026-05-10 → 2026-05-11 window: `lens_behavioral_parity_demonstration_test.rs` (gate #73 snappy-raven-508 PR #2525), `r3_gate_87_lens_cementing_regen_receipts_test.rs` (gate #87 PR #2639), `r3_lens_producer_retirement_executable_witness_test.rs` (PR #2595), `t_ci_workflow_as_data_demo_test.rs` (T-Workflow-As-Data demo). Many gates landed (T-Tests-As-Data #84/#85/#86/#87; T-Bridge-Retirement gate #31; T-LensProducer gates #5+#6; T-V-L4 #11/#13; T-V-L7 #10/#15; gate #74 + gate #27 + gate #26 + many others). **Cluster M Phase 3 bulk port NOT yet kicked in to shrink census** | gate-landing tests accrue evidence toward the 96 §1.8 gates GREEN target; SG-0 census still accumulating until Phase 3 bulk-port worker migration completes (calm-newt-602 + silent-swift-300 active). True 1-day delta vs 2026-05-10 EOD is +4 test entries; cumulative 11-day total is +47. Velocity tripwire (≥3:1, 7-day): **status pending/uncomputed** — will be computable once Phase 3 bulk port migration begins shrinking census | ## §4. Velocity-to-zero math -**Current state** (2026-05-10): 163 entries (53 non_test + 108 test + 2 fragments). True 10-day average is **+4.3/day** (43 entries over 2026-04-30 → 2026-05-10 window); 1-day delta vs 2026-05-09 EOD is **+1** (anthropic_messages_wire_demo_test.rs). Earlier "+13 anomaly" framing was a baseline-comparison artifact corrected here. +**Current state** (2026-05-11): 167 entries (53 non_test + 112 test + 2 fragments). True 11-day average is **+4.3/day** (47 entries over 2026-04-30 → 2026-05-11 window); 1-day delta vs 2026-05-10 EOD is **+4** (gate-landing tests from #73 / #87 / lens-producer retirement witness / T-Workflow-As-Data demo). Census still accumulating (Cluster M Phase 3 bulk port not yet kicked in). **Required for R3 close**: 0 + 0 + 0. From 31afc51ac7350cfe587101db2792a549dcf4a680 Mon Sep 17 00:00:00 2001 From: Brian Searls Date: Mon, 11 May 2026 00:25:55 +0000 Subject: [PATCH 2/2] =?UTF-8?q?docs(audit):=20address=20codex=20BLOCKING?= =?UTF-8?q?=20on=20PR=20#2665=20=E2=80=94=20PR-merge=20vs=20=C2=A71.8=20ga?= =?UTF-8?q?te-PASSING?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit Same root cause as PR #2583 codex BLOCKING #5/#6 (memorized as feedback_pm_compile_audits_pre_existing_errors): PR-merge events ≠ §1.8 gate-PASSING promotion. Cell text said "T-Tests-As-Data gates #84/#85/#86/#87 landed". Verified against §1.8 ledger at HEAD: - #84 `every_rust_test_ports_to_dag_or_generated`: DECLARED — cannot promote until EXPECTED_HAND_AUTHORED_TEST = 0 (Phase 3 bulk-port close criterion) - #85 `forall_exists_quantifier_substrate_landed`: DECLARED — carriers landed via PR #2647 but CONSUMER_LANDED not yet claimed; §P2 requires generated consumer of declared surface - #86 `program_generator_carrier_landed`: CONSUMER_LANDED + PASSING ✓ - #87 `lens_cementing_test_discipline_complete`: CONSUMER_LANDED (PR #2639), NOT PASSING — 8 regen harnesses still Compiles-only placeholders per §1.8 close-criterion Only #86 is fully PASSING. Cell reframed to distinguish PR-merge evidence from canonical §1.8 status per memorized discipline; row notes the status drift sweep step that promotes evidence to PASSING. Same reframe applied to T-Bridge-Retirement #31, T-LensProducer #5/#6, T-V-L7 #10 — PR-merges with §1.8 status drift sweep pending. Co-Authored-By: Claude Opus 4.7 (1M context) --- docs/audit/r3-sg0-trajectory-tracker.md | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/docs/audit/r3-sg0-trajectory-tracker.md b/docs/audit/r3-sg0-trajectory-tracker.md index 9a5f9628901..9b2ef8eb4d6 100644 --- a/docs/audit/r3-sg0-trajectory-tracker.md +++ b/docs/audit/r3-sg0-trajectory-tracker.md @@ -52,7 +52,7 @@ echo "$(date -u +%Y-%m-%d) | $sha | non_test=$non_test test=$test fragments=$fra | **2026-05-09 EOD** | **eb2cc15cd** (last commit before 2026-05-10 UTC) | **53** | **107** | **2** | **162** | **+12 (retroactive correction; 9-day total: +42)** | 12 entries landed during 2026-05-09 evening: T-CostLens γ-ratification (#2283), R3 plan audit (#2501), 21-PR cycle (R3 P0 dissolutions + gate landings + audit + bridge retirements) | retroactive baseline correction; previous tracker row (150) was taken mid-day on 2026-05-09 before the evening cycle landed; honest EOD count is 162 | | **2026-05-10 (00:38Z)** | **f1588bcc8** | **53** | **107** | **1** | **161** | **−1 (vs 2026-05-09 EOD)** | (none) — 1 fragment removed (`parse_corpus_manifest.txt`-class transient) between eb2cc15cd and f1588bcc8 | Director-receipted intermediate reading at gunbc#828 c#4414054598 (committed on `session/gentle-newt-665` branch as 88e6fca99; never merged to main due to session archival). Director framing: "Trajectory NOT yet inflected toward shrink — bulk events queued (gate #6 wise-crane-831 ACTIVE, F2 PR #2473, T-Tier3 D2a PR #2285, carve-promotion #81/#82/#83/#95) but pre-land at snapshot. Alarm 1 + Alarm 2 tripped on extrapolation against the (then-stale) 150 baseline." Honest delta vs corrected EOD baseline (162) is **−1** (a marginal shrinkage), not +11 | | **2026-05-10 (later)** | **cea1fbe87** | **53** | **108** | **2** | **163** | **+2 (vs f1588bcc8 intermediate; +1 vs 2026-05-09 EOD)** | PR #2506 [codex] add anthropic wire demo (1 test entry + 1 fragment re-added: `anthropic_messages_wire_demo_test.rs` + manifest fragment) | **velocity is steady, not anomalous** (prior +13 framing was a baseline-comparison artifact; Director's +11 framing was the same artifact against the 150 baseline). True 1-day delta vs 2026-05-09 EOD is +1 entry net; cumulative 10-day total is +43 (+30 prior + +12 retroactive 2026-05-09 evening + +1 today). Velocity tripwire (≥3:1 introduction:dissolution, 7-day): **status pending/uncomputed** — 7-day cumulative ratio not yet computed in this snapshot; will be computed once Cluster M Phase 1 lands | -| **2026-05-11** | **31acf4357** | **53** | **112** | **2** | **167** | **+4 (vs 2026-05-10 cea1fbe87)** | 4 new test entries from gate-landings during 2026-05-10 → 2026-05-11 window: `lens_behavioral_parity_demonstration_test.rs` (gate #73 snappy-raven-508 PR #2525), `r3_gate_87_lens_cementing_regen_receipts_test.rs` (gate #87 PR #2639), `r3_lens_producer_retirement_executable_witness_test.rs` (PR #2595), `t_ci_workflow_as_data_demo_test.rs` (T-Workflow-As-Data demo). Many gates landed (T-Tests-As-Data #84/#85/#86/#87; T-Bridge-Retirement gate #31; T-LensProducer gates #5+#6; T-V-L4 #11/#13; T-V-L7 #10/#15; gate #74 + gate #27 + gate #26 + many others). **Cluster M Phase 3 bulk port NOT yet kicked in to shrink census** | gate-landing tests accrue evidence toward the 96 §1.8 gates GREEN target; SG-0 census still accumulating until Phase 3 bulk-port worker migration completes (calm-newt-602 + silent-swift-300 active). True 1-day delta vs 2026-05-10 EOD is +4 test entries; cumulative 11-day total is +47. Velocity tripwire (≥3:1, 7-day): **status pending/uncomputed** — will be computable once Phase 3 bulk port migration begins shrinking census | +| **2026-05-11** | **31acf4357** | **53** | **112** | **2** | **167** | **+4 (vs 2026-05-10 cea1fbe87)** | 4 new test entries from gate-related PR landings during 2026-05-10 → 2026-05-11 window: `lens_behavioral_parity_demonstration_test.rs` (PR #2525 / gate #73 evidence), `r3_gate_87_lens_cementing_regen_receipts_test.rs` (PR #2639 / gate #87 evidence), `r3_lens_producer_retirement_executable_witness_test.rs` (PR #2595), `t_ci_workflow_as_data_demo_test.rs` (T-Workflow-As-Data demo). PR-merge evidence accrued for many gates (T-Tests-As-Data #86 **CONSUMER_LANDED + PASSING** via PR #2645; #87 **CONSUMER_LANDED** via PR #2639 (not yet PASSING — 8 regen harnesses still `Compiles`-only placeholders per §1.8 close-criterion); #85 carriers landed via PR #2647 but **CONSUMER_LANDED not yet claimed** (§1.8 status remains **DECLARED**); #84 **DECLARED** in §1.8 — cannot promote until EXPECTED_HAND_AUTHORED_TEST = 0; T-Bridge-Retirement gate #31 + T-LensProducer gates #5/#6 + T-V-L7 gate #10 PR-merged with separate §1.8 status drift sweep pending). **Cluster M Phase 3 bulk port NOT yet kicked in to shrink census; PR-merge evidence ≠ §1.8 gate-PASSING per separate status drift sweep step.** | gate-landing/related PR-merges accrue evidence toward the 96 §1.8 gates GREEN target via separate drift sweeps; canonical §1.8 status authoritative per row. SG-0 census still accumulating until Phase 3 bulk-port worker migration completes (calm-newt-602 + silent-swift-300 active). True 1-day delta vs 2026-05-10 EOD is +4 test entries; cumulative 11-day total is +47. Velocity tripwire (≥3:1, 7-day): **status pending/uncomputed** — will be computable once Phase 3 bulk port migration begins shrinking census | ## §4. Velocity-to-zero math