Skip to content

Timeline for progress

Rachitt Shah edited this page Jul 20, 2021 · 2 revisions

Hey everyone, as per our call on the 15th of July to steer our GSoD project on it's course, here's a proposed plan of action that would help us chart a course much better.

This plan is assuming dates/timelines to be flexible, but the deliverables are concrete and would really like to get feedback on the same.

Week one:

  1. The content in the following areas would be made more visible -
  • Contributing to HPX
  • Building HPX documentation
  • Building HPX on Windows, shifting build instructions from Manual to User Documentation.
  • Writing test cases for Windows
  • Create FAQ section for installation(mainly for windows)
  • Structure the Terminology page to make it more inviting/readable.
  • Add more details to troubleshooting, we if have errors.
  • Starting to work on a design document that would define the language of how should the docs be added.
Clone this wiki locally