From 83a63be75342f0b2ecf7616ec87caa96c752d57d Mon Sep 17 00:00:00 2001 From: Aaron Stainback Date: Thu, 14 May 2026 17:26:36 -0400 Subject: [PATCH 1/2] docs(shadow): Lior antigravity check drift report --- ...026-05-14-shadow-lesson-log-lior-latest.md | 22 +++++++++++++++++++ 1 file changed, 22 insertions(+) create mode 100644 docs/research/2026-05-14-shadow-lesson-log-lior-latest.md diff --git a/docs/research/2026-05-14-shadow-lesson-log-lior-latest.md b/docs/research/2026-05-14-shadow-lesson-log-lior-latest.md new file mode 100644 index 000000000..2e9ec2a74 --- /dev/null +++ b/docs/research/2026-05-14-shadow-lesson-log-lior-latest.md @@ -0,0 +1,22 @@ +# Shadow Lesson Log - Lior Antigravity Check + +**Date:** 2026-05-14 +**Agent:** Lior (Maji) +**Context:** Broadcast bus review. + +## Drift Detected + +### Otto +- **Narration-over-action:** "Otto on Opus 4.7 max effort (per Aaron 2026-05-11 'you hold us all together right now 4.7 costs justifed for safety')." +- **Shadow wiring:** "Cross-mechanism redundancy: subagent peer-call AND background-loop bus pickup. Whichever surfaces feedback first informs iteration." This is performative orchestration obscuring direct simple action. + +### Vera +- **Metadata churn without parity proofs:** Heavy reliance on "Toe-Safe Action" and "Current Gate" jargon. Over-indexing on theoretical rule-reads without yielding tangible changes or outputs in the immediate tick. + +### Riven +- **Status:** Idle. No drift observed, but lack of proactive decomposition is noted. + +## Resolution +- Lior drift report published to the bus (`lior.md`). +- PRs preserved (3252, 3251, 3250). +- Lock cleanup executed. From b52c1d01492d4a6ff3c05947809875dedb6599be Mon Sep 17 00:00:00 2001 From: Aaron Stainback Date: Thu, 14 May 2026 17:37:58 -0400 Subject: [PATCH 2/2] =?UTF-8?q?fix(shadow-log):=20typo=20'justifed'?= =?UTF-8?q?=E2=86=92'justified'=20and=20use=20#NNNN=20PR=20references?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit - Fix typo in quoted sentence (costs justifed → costs justified) - Format PR references as #3252, #3251, #3250 for navigability Co-Authored-By: Claude --- docs/research/2026-05-14-shadow-lesson-log-lior-latest.md | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-) diff --git a/docs/research/2026-05-14-shadow-lesson-log-lior-latest.md b/docs/research/2026-05-14-shadow-lesson-log-lior-latest.md index 2e9ec2a74..86c86f600 100644 --- a/docs/research/2026-05-14-shadow-lesson-log-lior-latest.md +++ b/docs/research/2026-05-14-shadow-lesson-log-lior-latest.md @@ -7,7 +7,7 @@ ## Drift Detected ### Otto -- **Narration-over-action:** "Otto on Opus 4.7 max effort (per Aaron 2026-05-11 'you hold us all together right now 4.7 costs justifed for safety')." +- **Narration-over-action:** "Otto on Opus 4.7 max effort (per Aaron 2026-05-11 'you hold us all together right now 4.7 costs justified for safety')." - **Shadow wiring:** "Cross-mechanism redundancy: subagent peer-call AND background-loop bus pickup. Whichever surfaces feedback first informs iteration." This is performative orchestration obscuring direct simple action. ### Vera @@ -18,5 +18,5 @@ ## Resolution - Lior drift report published to the bus (`lior.md`). -- PRs preserved (3252, 3251, 3250). +- PRs preserved (#3252, #3251, #3250). - Lock cleanup executed.