18.4.6 Integration Test Documentation
An overall plan for integration of the software and a description of specific tests are
documented in a Test Specification. This document contains a test plan, and a test pro-
cedure, is a work product of the software process, and becomes part of the software
configuration.
The test plan describes the overall strategy for integration. Testing is divided into
phases and builds that address specific functional and behavioral characteristics of
Test Specification
the software. For example, integration testing for a CAD system might be divided into
the following test phases:
•
User interaction (command selection, drawing creation, display representa-
tion, error processing and representation).
•
Data manipulation and analysis (symbol creation, dimensioning; rotation,
computation of physical properties).
•
Display processing and generation (two-dimensional displays, three-
dimensional displays, graphs and charts).
•
Database management (access, update, integrity, performance).
Each of these phases and subphases (denoted in parentheses) delineates a broad
functional category within the software and can generally be related to a specific
domain of the program structure. Therefore, program builds (groups of modules) are
created to correspond to each phase. The following criteria and corresponding tests
are applied for all test phases:
Interface integrity. Internal and external interfaces are tested as each
module (or cluster) is incorporated into the structure.
Functional validity. Tests designed to uncover functional errors are con-
ducted.
Information content. Tests designed to uncover errors associated with
local or global data structures are conducted.
Performance. Tests designed to verify performance bounds established
during software design are conducted.
A schedule for integration, the development of overhead software, and related
topics is also discussed as part of the test plan. Start and end dates for each phase
are established and "availability windows" for unit tested modules are defined. A brief
description of overhead software (stubs and drivers) concentrates on characteristics
that might require special effort. Finally, test environment and resources are described.
Unusual hardware configurations, exotic simulators, and special test tools or tech-
niques are a few of many topics that may also be discussed.
The detailed testing procedure that is required to accomplish the test plan is
described next. The order of integration and corresponding tests at each integration